Shed Restoration Update at Grace Lutheran Church

On Tuesday, November 24, 2026, club members returned to Grace Lutheran Church, 6190 Telephone Road, Ventura, to continue the shed restoration begun on November 21. That earlier work is described in Shed Restoration at Grace Lutheran Church.

Robert Shank KM6RSS and Pedro Morillas K6MIL installed a drip edge along the base of the long walkway wall before Geoffrey Dann N3CFX arrived. Pedro then fastened the bottom of the new siding on the long walkway wall. At the front of the shed, Geoffrey and Pedro removed the old door and began installing new plywood in the door bay. Robert helped carry the plywood and used the nail and brad gun to tack the sheets in place. He applied a coat of primer to the long walkway wall and to the plywood on the front of the shed to the left of the door, and took the photographs.

Work on the shed is still underway. The new plywood in the door bay, where the old door was, has not yet been primed, and a new door has not been hung. When the shed is finished and painted to match the church’s other buildings, the club will use it to store picnic and Field Day supplies, so that gear doesn’t have to be kept at members’ homes.

Our sincere thanks again to Grace Lutheran Church for allowing the club to rebuild the shed and share it with them.

The long walkway wall of the shed, sheathed in new unpainted plywood, with a yellow ladder at the right.
The long walkway wall at the end of the November 21 work day, with the new plywood in place and ready for primer.
The shed at the start of the work day, with new unpainted plywood on the long wall and the old door still in place at the front.
The shed at the start of the November 24 work day, with the new plywood on the long wall and the old door still in place at the front.
Two club members removing the old shed door.
Left to right: Pedro Morillas K6MIL and Geoffrey Dann N3CFX remove the old shed door.
The long walkway wall after a coat of primer, with a club member working at the far right-hand corner and drop cloths on the ground.
The long walkway wall after a coat of primer. Pedro Morillas K6MIL works at the right-hand corner.
The front of the shed, with primer on the left and unpainted new plywood on the right where the old door was, and a wooden ramp in front.
The front of the shed at the end of the November 24 work day. The plywood to the left of the door has been primed; the new plywood where the old door was has not yet been primed, and a new door has not been hung.
The long walkway wall of the shed after a coat of white primer, with a green fascia and brown shingle roof.
The long walkway wall after a coat of primer.
Bookmark the permalink.

Comments are closed.